Nevin Road Extension – Stormwater

Project Facts
  • Location: Charlotte, NC
  • City of Charlotte (Client), DRMP (Prime Consultant)
  • Municipal, Stormwater
The Story

As a sub-consultant, DPR provided the City of Charlotte’s primary consultant with stormwater design for the roadway extension in the Nevin Road and Sugar Creek vicinity. The project is located in the Derita community, one of Charlotte’s oldest and most recognized communities. The services also included the stormwater downstream analysis (10% Rule) and an evaluation of existing dry detention ponds within the project limits.

Work Date: February 2003 – April 2007
Construction Cost: $1.4 M